4.4 Preparing to test emissions
According to the stipulations of Austrian standard ÖNORM M 5861-1, the flue gas
piping must have a built-in DN100 test flange.
The entire system must be thoroughly cleaned 2 to 3 days before emission tests
are performed. (The entire system in this case means: ash containers, combustion
chamber, vault, heat exchanger, smoke flue pipe connection between boiler and
cyclone, container under cyclone, flue gas piping and chimney).
System performance must be measured at full load and at partial load.
In the last two days before the test, system output must be increased to approxi‐
mately the rated output of the boiler. This is to prevent the release during testing of
any old deposits (e.g. tar) in the flue gas piping.
Wood chip as per ÖNORM M 7133 with a maximum water content of 30% must be
provided by the operator.
Wood chip size:
- for screw feed loading: max. G 50
- for hydraulic loading: max. G 100
One or two days before the test, the efficiency and settings of the system should
be checked by our service technician.The system must be set up for the fuel to be
used during the emission tests (test measurements by our service technician).
Our service technician will be present at the tests. Emission tests should be car‐
ried out by an accredited test institute or, in Germany, a chimney sweep.
4.5 Maintenance agreement / Customer service
NOTICE! We recommend a yearly inspection by Froling customer services or an au‐
thorised partner (third party maintenance).
Regular maintenance and servicing by a heating specialist will ensure a long, trouble-
free service life for your heating system. It will ensure that your system stays environ‐
mentally-friendly and operates efficiently and cost-effectively.
In the course of this maintenance the entire system is inspected and optimised, partic‐
ularly regulation and control of the boiler. The emission measurement carried out can
also be used to draw conclusions about the combustion performance of the boiler.
For this reason, FROLING offers a service agreement, which optimises operating
safety. Please see the details in the accompanying guarantee certificate.
Your Froling customer service office will also be happy to advise you.
NOTICE
All national and regional regulations relating to regular testing of the system must
be observed. Please be advised that, in Austria, commercial systems with a rated
heat output of 50 kW or more must be regularly tested at yearly intervals in ac‐
cordance with the Heating Plant Regulations (Feuerungsanlagen-Verordnung).
4.6 Replacement parts
With Froling original replacement parts in your boiler, you are using parts that match
perfectly. As the parts fit together so well, installation times are shortened and a long
service life is maintained.
4
Servicing
Preparing to test emissions
42 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
Page view 41
1 2 ... 37 38 39 40 41 42 43 44 45 46

Comments to this Manuals

No comments