Sharp TM150 Operations Instructions Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 46
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
2.4.4 Protective equipment for operating staff
You must ensure that staff have the protective equipment specified by accident pre‐
vention regulations.
For inspection and cleaning:
- suitable workwear
- protective gloves
- sturdy shoes
Additional for operating:
- Hearing protection (sound level > 70 dB)
- Protective goggles
2.5 Design information
Carrying out modifications to the system and changing or deactivating safety equip‐
ment is prohibited.
Always comply with all fire, building, and electrical regulations when installing or oper‐
ating the system, in addition to following the operating instructions and mandatory reg‐
ulations that apply in the country in which the tank is operated.
2.5.1 Installation and approval for the heating system
The boiler should be operated in a closed heating system. The following standards
govern the installation:
ÖNORM / DIN EN 12828 Heating Systems in Buildings
NOTICE! Each heating system must be officially approved.
The appropriate supervisory authority (inspection agency) must always be informed
when installing or modifying a heating system, and authorisation must be obtained
from the building authorities:
Austria: Inform the civic/municipal building authorities.
Germany: Notify an approved chimney sweep and the building authorities.
2.5.2 General information for installation room (boiler room)
Boiler room characteristics
There must not be a potentially explosive atmosphere in the boiler room as the
boiler is not suitable for use in potentially explosive environments.
The boiler room must be frost-free.
The boiler does not provide any light, so the customer must provide sufficient light‐
ing in the boiler room in accordance with national workplace design regulations.
When using the boiler above 2000 metres above sea level you should consult the
manufacturer.
Note on standards
2
Safety
Permitted uses
12 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 45 46

Comments to this Manuals

No comments