4.3.1 Required jobs and checks
❒ The following maintenance schedule is based on max. 3000 service hours per
year.
➥ Reduce the intervals if this number is exceeded.
Daily
1 Chamber + heat exchanger
❒ General visual inspection
❒ Clean components if necessary
➥ Change defective components immediately.
2 ID fan + flue gas pipe
❒ General visual inspection
❒ Clean components if necessary
➥ Change defective components immediately.
3 Combustion air blower fan
❒ General visual inspection
❒ Clean components if necessary
➥ Change defective components immediately.
Weekly
4 Geared motors
❒ Visually check all geared motors for oil leaks
5 Heat exchanger ash removal (not pictured)
❒ Check the ash level
❒ Check for unburned material and foreign bodies
❒ Empty ash container if necessary
6 Chamber ash removal
❒ Check the ash level
❒ Check for unburned material and foreign bodies
❒ Empty ash container if necessary
4
Servicing
Maintenance schedule
30 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com
Comments to this Manuals