Sharp AR-C360P Installation Guide Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 29
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
2
3. Install the metal brackets where the
breakout panels were.
4. Open the face-up stacker (
!
), then open
the flap and press it onto the stacker surface
(
"
).
5. Close the stacker.
Step 2: Prepare the Inverter
Before assembling the finisher, you must adjust the
height of the inverter unit to match the finisher:
!
Inverter as supplied
"
Inverter changed for use with 4-tray
finisher.
1. Unpack the inverter and remove any packing
materials.
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 27 28 29

Comments to this Manuals

No comments