Endcaps 19
E-EQ-MX1RG-D MX1 Reference Guide
Installation
1. Lay the MX1 unit face up on the work surface.
2. Carefully align the O-Ring Gasket in the O-Ring Gasket Slot -- making sure the curved edge
of the side tabs are towards the back of the endcap.
3. Position the endcap with the open side of the endcap toward the open side of the unit.
Connect the ribbon cable to proper ZIF connectors in the endcap. (See the Removal section
on ZIF connectors.)
4. Gently separate the MX1 front cover from the back cover and mate the open ends of the
endcap and the unit without pinching or stretching the O-Ring Gasket.
5. Check to make sure the ribbon connector is not pinched or otherwise caught between the
endcap and the unit.
6. Place the screws in the screw holes on the back of the MX1. Torque the screws to no more
than 3 inch pounds of pressure (.34 N/m). Overtorquing may cause damage to the MX1 unit.
Comments to this Manuals