Sharp YO-370 Manual Page 48

  • Download
  • Add to my manuals
  • Print
  • Page
    / 118
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 47
36 Revision 10 – 1/09/2015 FTS 370d/w/r
GROUND LEVEL
MARKER INTERFACE
ENCLOSURE
3/4 OVERALL
TOWER HEIGHT
MKR 370 LED
L-810 MARKERS
#8 AWG MIN
GROUND WIRE FROM
MARKER INTERFACE
ENCLOSURE TO
TOWER STEEL
MARKER INTERFACE
ENCLOSURE
1/4 OVERALL
TOWER HEIGHT
MKR 370 LED
L-810 MARKERS
#8 AWG MIN
GROUND WIRE FROM
MARKER INTERFACE
ENCLOSURE TO
TOWER STEEL
FLASHHEAD
FH370d/w
FLASHHEAD
FH370d/w
FLASHHEAD
FH370d/w
1/2 OVERALL TOWER HEIGHT
(BUT NOT LOWER THAN 200')
#2 AWG MIN
TO SITE
GROUNDING
SYSTEM
(TYP OF 3)
SC 370d/w
TOP
SC 370d/w
MID A
SC 370d/w
MID B
#8 AWG MIN
GROUND WIRE
FROM FLASHHEAD
TO TOWER STEEL
#8 AWG MIN
GROUND WIRE
FROM FLASHHEAD
TO TOWER STEEL
(TYP OF 2)
LIGHTNING ROD
MUST EXTEND 36" (MIN)
ABOVE AND BE LOCATED 18"
HORIZONTALLY AWAY FROM
UPPERMOST FLASHHEAD(S)
Note: Markers and Marker Interface Enclosure are omitted for D2 Installation.
Figure 2-17 – Typical E2/D2 Component Locations
Page view 47
1 2 ... 43 44 45 46 47 48 49 50 51 52 53 ... 117 118

Comments to this Manuals

No comments