Sharp LC-26DV10U Specifications Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 103
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
DISASSEMBLY INSTRUCTIONS
B2-1
2. REMOVAL OF DVD DECK PARTS
2-1: TRAVERSE ASS'Y (Refer to Fig. 2-1-A)
Remove the 3 screws 1.
Unlock the 2 supports 2.
Remove the Insulator (R) from the Loader Sub Ass'y.
Remove the Traverse Ass'y.
1.
2.
3.
4.
Fig. 2-1-A
Insulator (R)
NOTE
1. Disassemble only the DVD DECK PARTS parts listed
here. Minute adjustments are needed if the
disassembly is done. If the repair is needed except
listed parts, replace the DVD MECHA ASS'Y.
1
2
Loader Sub Ass'y
Traverse Ass'y
2
Fig. 2-1-B
• Screw Torque: 2.0 ± 0.3kgf•cm
1
1
NOTE
1. In case of the Traverse Ass'y installation, hook the wire
on the Loader Ass'y as shown Fig. 2-2-B to Fig. 2-2-D.
2-2:
Remove the Insulator (F).
Remove the Insulator (R).
Unlock the support 1.
Remove the Gear Middle.
Remove the screw 2.
Remove the Rack Feed Ass'y.
Remove the screw 3.
Remove the Switch PCB Ass'y.
Remove the screw 4.
Remove the Gear Feed.
Remove the 2 screws 5.
Remove the Feed Motor.
Remove the Gear Motor.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
SWITCH PCB ASS'Y/GEAR MIDDLE/GEAR FEED/RACK
FEED ASS'Y/FEED MOTOR (Refer to Fig. 2-2-A)
3
Gear Middle
Gear Motor
Feed Motor
• Screw Torque: 1.3 ± 0.3kgf•cm (Screw 2)
• Screw Torque: 3.0 ± 0.3kgf•cm (Screw 3)
• Screw Torque: 1.0 ± 0.3kgf•cm (Screw 4, 5)
Switch PCB Ass'y
2
4
Rack Feed Ass'y
Gear Feed
5
Fig. 2-2-A
Traverse Ass'y
5
1
Insulator (R)
Insulator (F)
Insulator (F)
NOTE
1.
2.
3.
4.
When installing the Rack Feed Ass'y, push both ends to
align the teeth as shown Fig. 2-2-B. Then install it.
In case of the Gear Motor installation, check if the value
of the Fig. 2-2-C is correct.
When installing the wire of the Switch PCB Ass'y, install
it correctly as Fig. 2-2-D.
Manual soldering conditions
• Soldering temperature: 350 ± 5˚C
• Soldering time: Within 4 seconds
• Soldering combination: Sn-3.0Ag-0.5Cu
After the assembly of the Traverse Ass'y, hook the wire
on the Traverse Ass'y as shown Fig. 2-2-E.
[OK] [NG]
Fig. 2-2-B
Rack Feed Ass'y
Push
Push
Fig. 2-1-D
Loader Ass'y (Top Side)
Check Hook
Check Hook
Loader Ass'y (Bottom Side)
Check Lock Check Lock
Fig. 2-1-C
Loader Ass'y
40 ± 5mm
3 ± 1mm
Check Hook
Check Hook
Check Hook
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 102 103

Comments to this Manuals

No comments